Methods Design & Engineering

ECS Office Building

Cairo Business Park, New Cairo, Egypt

Client
Misr Italia
Sector
Administrative and corporate
Area
252 m²
Date
December 2024
Scope
LEED v4/v4.1 BD+C: New Construction assessment study, targeting Silver, and EDGE compliance report
Status
Achieved LEED v4 BD+C Silver and EDGE compliance
In alliance with
Iconic Design
Discipline
Sustainability
Energy savings target over ASHRAE 90.1-2010
21%
Indoor potable water reduction
45%
Construction waste diverted from landfill
75%

Methods Design & Engineering prepared the LEED v4/v4.1 BD+C Silver assessment study and the EDGE compliance report for the ECS Office Building at Misr Italia’s Cairo Business Park in New Cairo.

Sustainability highlights

  • Energy and envelope: a target of 21% energy savings over ASHRAE 90.1-2010, with double glazing (U-value 1.4 W/m²K, shading coefficient 0.24), reduced lighting power density, and energy sub-metering for HVAC and lighting
  • Water efficiency: 45% indoor potable water reduction with low-flow fixtures, and outdoor water cut through native low-water planting, drip irrigation and municipal grey water
  • Transport: a small parking footprint of 12 spaces, with preferred carpool and green vehicle spaces and electric vehicle charging
  • Site and waste: high-reflectance roofing and paving to reduce heat island, a recyclables room, and 75% of construction waste diverted from landfill
  • Indoor environment: ventilation to ASHRAE 62.1 with 30% more outdoor air, MERV 13 filtration, low-emitting materials, and daylight in over 75% of occupied spaces

Back to top